Extraction Facility Permitting Support, Sultan, WA
CE+C was the mechanical engineer to assist in permitting for ethanol extraction room and system in a marijuana processing facility…
CE+C was the mechanical engineer to assist in permitting for ethanol extraction room and system in a marijuana processing facility…
CE+C provided permitting support for the conversion of a lab space to a CO2 extraction lab in Arlington, WA. Our…
CE+C was the mechanical engineer for a tenant improvement and building expansion adding a cannabis facility to an existing pre-manufactured…
CE+C was the mechanical engineer for design services for room fire protection, life safety, and electrical for a new C1D1…
CE+C was the prime consultant and MEP engineer for the interior build-out of a cannabis facility. The building is approximately…
CE+C provided design services for room fire protection/life safety and electrical for CO2 and ethanol rooms at a processing facility…
CE+C provided HVAC and fire protection/life safety design for a flowering room & process space within an existing cannabis facility…
CE+C was the mechanical engineer for the subdivision of an existing grow room to add two extraction rooms and loading…
CE+C was originally hired as the engineer of record for a design build contractor, to provide basic air handling systems…
CE+C provided commissioning of a 10,000 sf marijuana growing facility for code-minimum commissioning for the 2015 Washington State Energy Code,…
When you process 80,000 pounds of cannabis every year, you need a facility that works. That’s why our client chose…
CE+C provided fire protection evaluation, design, and detailing for permit documents for a new cannabis greenhouse in northwest Washington. The…
We helped three processors in Eastern Washington get up and running quickly in mobile labs in converted steel shipping containers.…